Recurring Switchgear Installation Problems We Handle

Facility owners and property managers reach out about these issues more than any others when planning a switchgear project.

⚡

Nuisance Tripping With No Clear Cause

Unexplained trips usually mean protective devices were never properly coordinated to trip in the correct sequence. We run a full coordination study and set relays and breakers to work together as designed.

🕰

Existing Switchgear Beyond 25 Years Old

Aging gear without digital monitoring becomes harder to source parts for and more likely to fail without warning. We assess remaining service life and plan a replacement before a failure forces an emergency shutdown.

📈

Expansion Plans the Current Panel Can't Support

A new production line, server room, or HVAC upgrade often reveals that existing switchgear has no spare capacity. We size new installations with realistic growth margin so a single expansion doesn't trigger a second full project.

📋

Not Sure If Plan Approval Is Needed

Certain service and feeder thresholds require plans submitted and examined by the provincial electrical safety authority before work begins. We determine whether a project qualifies and manage the full submission process.

⚠

No Arc Flash Labeling on Existing Equipment

Unlabeled panels leave maintenance staff with no accurate information about the actual hazard present during service work. We perform a full arc flash hazard analysis and label every piece of equipment with calculated incident energy.

🔌

Crowded Feeder Panel With No Spare Room

Feeder sections filled to capacity make adding a single new circuit into a major project. We design distribution layouts with spare feeder capacity built in from the start.

🕒

Can't Shut Down Operations for Installation

Some facilities genuinely cannot tolerate a full power interruption during a switchgear swap. We plan phased cutover or temporary power strategies that keep critical systems running through the installation window.

🛡

Choosing Between Metal-Enclosed and Arc-Resistant Gear

Facility owners often aren't sure which configuration fits their actual risk profile and maintenance needs. We walk through the tradeoffs specific to how often staff will work near live equipment before recommending a specification.

🚪

Equipment Too Large for Existing Access Points

Switchgear delivered before confirming loading dock, doorway, or elevator dimensions can turn installation day into a logistics crisis. We verify rigging access during the site walkthrough, well before equipment ever leaves the factory.

Testimonials

Why People Called Us Back

Facilities Manager Tom R.

Coordination study caught what our old gear missed

We had nuisance tripping for years and nobody could explain why. St. Thomas Electrical Services ran a full coordination study and found the protective devices were never set up to work together properly. Zero unexpected trips since the new install.

Denise K.

Handled the plan approval process for us

We had no idea our expansion crossed the threshold requiring plan review before work could start. Their team managed the entire submission and kept our timeline mostly intact despite the extra step.

Anthony B.

Great result, lead time was longer than we expected

The custom gear we needed took over 25 weeks to arrive, which pushed our schedule back further than we initially hoped. St. Thomas Electrical Services explained this was normal for our configuration and the installation itself went smoothly once equipment arrived.

Facilities Manager Grace L.

Sized for growth we hadn't even planned yet

St. Thomas Electrical Services asked detailed questions about our five and ten-year plans before finalizing the specification. Eighteen months later we added a production line and the existing switchgear handled it without a single change order.

Marcus H.

Arc flash labeling gave our maintenance staff real confidence

Our previous gear had no incident energy labels at all, which made our safety team nervous every time someone had to work near it. Every panel now has clear labeling and our staff actually trusts the information.

Patricia W.

Phased cutover kept us running during installation

We could not afford a full shutdown during business hours, so the team planned a phased approach that kept most of our operation online throughout the swap. Genuinely impressed with how little disruption we actually experienced.

What Happens

Four Steps From Problem to Paperwork

Licensed electrician finishing work at an electrical panel

Make Contact

We will tell you on the phone whether this is urgent, and that advice costs you nothing whether you book anything afterwards or not.

Look and Price

The board, the load and the access all get checked. You end up with a figure that includes the permit and holds for sixty days.

Get It Done

Booked for a time that suits, done by the electrician who quoted it, and staged so the building keeps working if it runs more than a day.

Finish Properly

Tested, inspected, labelled and certified, with a two-year warranty on our labour and the manufacturer cover on the equipment.

Homes, Rentals and Workshops

Staged So Nothing Has to Close

Multi-unit supplies are rarely documented. We trace them first, then stage the work with power restored each evening so nobody stops trading.

Get in Touch

Homes, Rentals and Workshops

Contact St. Thomas Electrical Services about unit boards, workshop circuits, rewiring or standby power across St. Thomas.

Nothing Has to Close

Work is staged with power restored each evening, so tenants stay in place and a workshop never loses a full day.

CALL US (226) 779-4314 EMAIL US Describe the premises

Send Us a Message

Your details stay with us.

Protected and Confidential